Project Hyndburn has been assembled through a structured programme of planning, engineering and technical assessment, supported by a multidisciplinary team of specialist consultants.
Project Hyndburn benefits from a secured 25 MW grid connection. The availability of substantial electrical capacity forms a key component of the project's infrastructure proposition and underpins its potential suitability for a range of energy and digital infrastructure applications.
Further technical information relating to the grid connection is available through the confidential investor information process.
On-site energy infrastructure
Planning permission has been granted by Hyndburn Borough Council for the approved development. The project team is actively progressing the discharge of the remaining planning conditions through the appointment of specialist consultants across the required technical disciplines.
Environmental work is being coordinated across a number of specialist disciplines to satisfy the planning requirements and support future development.
Baseline noise assessment, operational noise modelling, BS4142 assessment and acoustic mitigation design where required.
Environmental risk assessment, ground investigation, remediation strategy and verification reporting where required.
Biodiversity strategy, habitat enhancement, protected species considerations, lighting ecology and long-term habitat management.
Landscape design, soft and hard landscaping, tree protection, boundary treatment and landscape management.
Civil engineering design work is being undertaken to support the approved development, including surface water drainage, sustainable drainage systems (SuDS), highway access, vehicle tracking, turning areas, site access improvements and surface water management.
Project Hyndburn is being progressed alongside the necessary utility and infrastructure coordination required to support the approved development. Detailed utility information is available within the project's confidential technical information package where appropriate.
The project continues to advance through a structured programme of technical work designed to support implementation. The programme will continue to evolve as technical workstreams are completed and approved.
A comprehensive package of technical information has been prepared and continues to be developed as part of the project programme. Detailed documentation is available to qualified parties through the secure investor information process.
Access to technical information. Certain technical documents contain commercially sensitive information and are not published on the public website. Qualified investors, strategic partners and professional advisers may request additional information through the confidential enquiry process. Access will be considered on a case-by-case basis.
If you require further technical information relating to Project Hyndburn, we welcome confidential enquiries from appropriately qualified organisations.